proven results

We believe environmental progress is built on evidence.

This is where we share the impact of our work in the real world.

Operational Savings in Remediation Phase

15 May 2026

Achieving $184,500 in operational savings was possible through SVE/MPE optimization and showcasing the average 14.9 kg/day depletion rate to the regulator with effective real-time monitoring.

Underground Storage Tank Case Study

18 September 2023

In 2003, a third-party contractor conducted a phase II Environmental Site Assessment (“ESA”) due to light non-aqueous phase liquid (LNAPL) observed in one of the Underground Storage Tanks (“USTs”) nest piezometers. Soil and groundwater impacts exceeded the applicable criteria on and off-site (Figure 1). Follow-up groundwater monitoring events recorded concentrations of petroleum hydrocarbons (PHCs) in 2004 and 2005 exceeding guidelines.

Natural Source Zone Depletion Case Study

7 September 2023

As part of the decommissioning process, an initial Phase II Environmental Site Assessment was conducted on a former Bulk Fuel Facility that operated from the early 1960s to 2002.

Above-Ground Storage Tank

22 August 2023

An Above Storage Tank (“AST”) fuel spill occurred at the site on July 19, 2010, of which 3,581 litres of 10% blended ethanol gasoline leaked into a containment dyke.

Ready for your results?