Operational Savings in Remediation Phase
15 May 2026
Achieving $184,500 in operational savings was possible through SVE/MPE optimization and showcasing the average 14.9 kg/day depletion rate to the regulator with effective real-time monitoring.
Underground Storage Tank Case Study
18 September 2023
In 2003, a third-party contractor conducted a phase II Environmental Site Assessment (“ESA”) due to light non-aqueous phase liquid (LNAPL) observed in one of the Underground Storage Tanks (“USTs”) nest piezometers. Soil and groundwater impacts exceeded the applicable criteria on and off-site (Figure 1). Follow-up groundwater monitoring events recorded concentrations of petroleum hydrocarbons (PHCs) in 2004 and 2005 exceeding guidelines.
Natural Source Zone Depletion Case Study
7 September 2023
As part of the decommissioning process, an initial Phase II Environmental Site Assessment was conducted on a former Bulk Fuel Facility that operated from the early 1960s to 2002.
Above-Ground Storage Tank
22 August 2023
An Above Storage Tank (“AST”) fuel spill occurred at the site on July 19, 2010, of which 3,581 litres of 10% blended ethanol gasoline leaked into a containment dyke.