Tripling Hydrocarbon Depletion with BioLodestone
1 August 2024
Remediation methods, such as soil vapour extraction and in situ chemical oxidation are challenging in cold, low-permeability conditions, highlighting the need for alternative approaches. Using naturally occurring microorganisms to deplete hydrocarbons is attractive. However, it is challenging to repeatably execute this remediation technique successfully across multiple sites due to nuanced site mineralogies.
.webp)
Natural Source Zone Depletion Validation: How Much Hydrocarbon is Naturally Degrading
12 June 2024
Natural Source Zone Depletion (NSZD) refers to microbial and physical processes that reduce hydrocarbon content in the subsurface. Microorganisms degrade hydrocarbons deep in the soil and rapidly deplete available oxygen and other electron acceptors in the soil and groundwater. At that point, microorganisms begin to ferment hydrocarbons, producing organic acids. These organic acids are used by a group of microorganisms called methanogens, which consume these organic acids and release methane. The methane migrates towards the upper layers of soil, where another group of organisms, called methanotrophs, consume the methane and release carbon dioxide as a product.

ESG & Savings from Upstream Spill Bioremediation
27 May 2024
An active petroleum hydrocarbon pipeline site had 20,000 m3 of impact and an initial plume area of 8,100 m2 based on an environmental consulting firm’s Phase II Environmental Assessment. An active recovery program over five (5) years had recovered approximately 14% of the released product but was discontinued due to declining extraction efficiencies with high operating costs.

NSZD Validation: Measuring Natural Depletion
20 December 2023
The textbook approach to new or legacy spills is to ensure that you have a vertical and horizontal delineation of the pollutants. This understanding of how deep and wide your pollutant has travelled is essential before you can begin any remediation, restoration, or reclamation process. The rationale for this approach is that we should not begin a remediation process until we have enough information to ensure that it can be successful. Thus, we carefully assess a site, set data quality objectives, and carefully plan out the goal of a remediation program.

Underground Storage Tank Case Study
18 September 2023
In 2003, a third-party contractor conducted a phase II Environmental Site Assessment (“ESA”) due to light non-aqueous phase liquid (LNAPL) observed in one of the Underground Storage Tanks (“USTs”) nest piezometers. Soil and groundwater impacts exceeded the applicable criteria on and off-site (Figure 1). Follow-up groundwater monitoring events recorded concentrations of petroleum hydrocarbons (PHCs) in 2004 and 2005 exceeding guidelines.

Natural Source Zone Depletion Case Study
7 September 2023
As part of the decommissioning process, an initial Phase II Environmental Site Assessment was conducted on a former Bulk Fuel Facility that operated from the early 1960s to 2002.

Above-Ground Storage Tank
22 August 2023
An Above Storage Tank (“AST”) fuel spill occurred at the site on July 19, 2010, of which 3,581 litres of 10% blended ethanol gasoline leaked into a containment dyke.